• Project by: PIVOT Engineering - Samir AbouSamra
  • Location: Abu Dhabi, U.A.E.
  • Start Date: January 1994
  • Delivery Date: November 1996
  • Client: Abu Dhabi National Oil Company (ADNOC)
  • Consultant: TECHNIP - France

RUWAIS SULFUR HANDLING PLANT EXPANSION

All civil, MEP and piling works for the plant. The sulfur storage building was erected on 475 plots of 600m diameter and has frame foundations, stacker reclaimed foundations, shelter foundations and liquid pits. The project also included additional construction of a weight bridge and a maintenance building.