• Project by: PIVOT Engineering - Samir AbouSamra
  • Location: Ras Al Khaimah, U.A.E.
  • Start Date: September 1993
  • Delivery Date: December 1994
  • Client: Abu Dhabi National Oil Company for Distribution (ADNOC-FOD)
  • Consultant: Khatib & Alami Consultants U.A.E.

MINA SAQR FUEL DEPOT

All civil and MEP works related to the fuel depot including but not limited to roadways, interlocking pavements, tanks, cathodic protection, culverts, trenches, electric sub-stations, roadways, culverts, trenches, sub-stations, product pump house and fire pump house.