• Project by: U.C.C.-ENTERPRISE - Samir AbouSamra
  • Location: Lebanon
  • Start Date: April 1999
  • Delivery Date: Phase 1: September 2001
                            Phase 2: December 2002
  • Client: SOLIDERE
  • Consultant: F.M. Consultants Bureau Fouad Menhem

LOT #201 MAARFA'B – BEIRUT CENTRAL DISTRICT

Demolition & renovation works for a 3.500 m² area of an existing building including all civil, MEP and finishing work to cope with the existing architecture of the buildings in Maarad Street. The MEP package included 2 central chillers 120 Ton cap. each.