• Project by: PIVOT Engineering - Samir AbouSamra
  • Location: Abu Dhabi, U.A.E.
  • Start Date: December 1993
  • Delivery Date: April 1995
  • Client: Dept. of Social Services & Commercial Buildings (D.S.S.C.B.)
  • Consultant: Syr Consult U.A.E

H.H SHK MOHAMMAD BIN KHALID AL NAHYAN BUILDING – PLOT C-27/SECTOR W-8

All civil and MEP works for a building of 30.4mx30.4 m area with 19 stories with a height of 75m from ground level resting on 90cm diameter piles. The mechanical packages included a 4 air cooled package chillers system (1,384Tons TC).